MODERN I
A system that integrated of constructing a building by completing structural and architectural façade works floor-by-floor utilizing a planning timetable and moveable screens.
THE INVENTION
The invention utilizes a method of completing each floor with all structural and architectural features, including external doors, windows, balcony railing, aircon, ledge, and plastering within a period of 8 to 15 days.
Construction is carried out four storeys at a time, with the first floor completed as the fifth storey is raised.
Completion of each floor is achieved using a combination of:
A. HARDWARE
B. SOFTWARE
RISK MITIGATOR
Greater material strength and durability enhances fall prevention
SHORTER PROJECT TIMELINE
Faster completion within the time frame for high-rise buildings
OPTIMAL & EFFICIENT OPERATIONS
Accurate completion of façade per floor with lesser manpower
ENVIRONMENTALLY FRIENDLY
Cutting down on carbon emanations by restricting unnecessary mobility between the worksite and dormitory
Don’t wait any longer to bring your construction dreams to life. Partner with Builtup and experience unparalleled service and quality.
Our post-construction services gives you peace of mind knowing that we are still here for you even after.